VR
Gnee steel blog
Position: Home > Blog
Latest information
Gnee steel group is a supply chain integrated enterprise including steel plate, coil, profile, outdoor landscape design and processing
304 stainless steel pipes
What are the advantages of using 304 stainless steel pipes for water pipes?
The reasons why 304 stainless steel water pipes are suitable for water pipes mainly include their excellent corrosion resistance, high safety, high strength and pressure resistance, environmental protection and good processing performance.
2024-10-08
View: 1
904l stainless steel pipes
Japanese customers ordered 231 tons of 904l stainless steel pipes
Japanese customers visited GNEE stainless steel factory and ordered 231 tons of 904l stainless steel pipes.
2024-09-26
View: 2
Stainless-Steel Equal Angles
Stainless-Steel Equal Angles Both Grade 304 and 316 delivered to Vietnam
Stainless-Steel Equal Angles Both Grade 304 and 316 delivered to Vietnam
2024-08-28
View: 2
stainless steel
310S Pipe Exported To Thailand
Stainless Steel 310/310S is an austenitic high temperature alloy with very high nickel and chromium content for increased resistance to rust at mild cycling factors to 2000°F. ASTM A312 310 Seamless Pipe offers the same corrosion resistance, high metabolic resistance, and the ability to store more energy at room temperature than popular austenitic alloys such as Type 304.
2024-07-16
View: 4
304 stainless steel
ASME B16.28 A403 304 Short Radius Elbow Exported To Indian
ASME B16.28 is a standard that specifies the manufacturingdimensions for short radius elbows. These ASME B16.28 A403 304 Short Radius Elbows are typically used in piping systems to change the direction of flow. One common material used for manufacturing these elbows is A403 304 stainless steel.
2024-07-09
View: 5
Inconel Material
Inconel 600 round bars have been shipped to Vietnam
On June 20, we shipped a batch of Inconel 600 round bars to our Vietnamese customers. We knew that customers had an urgent need for this material, so we worked very hard to speed up production and shorten delivery time. In the end, we successfully completed the material delivery one month ahead of schedule.
2024-06-24
View: 4