Hastelloy C276 medium and thick plate performance characteristics
Processing performance: Hastelloy C-276 stainless steel plate has good processability and can be processed by cutting, welding, bending and other processing operations.
Fatigue resistance: The steel plate also has good fatigue resistance and can maintain stability under repeated stress
Precautions for use
Avoid contact with carbon steel: Hastelloy C-276 stainless steel plate should avoid contact with carbon steel during use to avoid carbide precipitation.
Ageing treatment: Aging treatment should be carried out during use to eliminate residual stress and improve stability. It is recommended to carry out insulation treatment after heating to 300℃-400℃, and the insulation time should be no less than 2 hours.
Product Type | Hastelloy C276 Plate |
---|---|
Specification | ASTM B575 / ASME SB575 |
Thickness | 0.1mm to 100 mm Thk |
Width | 10-2500mm |
Length | 2.44m, 2m, 3m, or as required |
Dimensions |
Hot rolled Hastelloy C276 Plates 3.0–10.0 mm Cold rolled Hastelloy C276 Plates 0.5-6.4 mm |
Hardness | Hard, Soft, Quarter Hard, Half Hard, Spring Hard |
Finish | 2B, SATIN, BA NO (8), 2D, Hot rolled plate (HR), Cold rolled sheet (CR), 1D, No.1 finish hot rolled, BA, No.4, hairline, 8K, mirror, brush etc. |
Why choosing GNEE
Hastelloy C-276 corrosion resistance supplied by GNEE has undergone multiple cold rolling and cold drawing processes, internal and external sizing, bright annealing and polishing, with high workmanship precision. It has the characteristics of high oil-free cleanliness, corrosion resistance, high temperature resistance, uniform wall thickness, high surface finish, etc. The steel pipe has good flexibility and is easy to install. It can be connected by automatic welding and ferrule.
1.Q.Are you a manufacturer?
A.Yes, we are a manufacturer and a well-known company with an early start in China's steel industry.
2. Q: What services do you provide?
A: Customized service for each customer, please feel free to contact us!
3.Q.What is the delivery time?
A. About 15-35 days after we confirm your request.